bg
Limitless possibilities
method of magnetic tomography
ground
01
The MTM method is applicable to all pipe diameters and bends
02
No changes in the operation of the pipeline are required
03
Does not have any impact on the pipeline
04
The probability of anomaly detection for more than 75%
A pressing problem for the pipeline industry worldwide is to ensure the reliability of facilities that are not subject to in-line inspection.
RDC "TRANSKOR-K»
leader in the development and application of Magnetic Tomography (MTM) Method)
For the first time – evaluation of technical condition of pipelines taking into account operating local stresses in real operating conditions.
For the first time – remote detection of areas with anomalies of stress-strain state due to the General and local loss of stability in the areas of landslide loads, currents, free sags, seismic active zones, weak bearing capacity of the soil, in the conditions of laying in mountainous and marshy areas.
worker
worker
worker
Our
projects
  • Work on MTM and AQUA MTM technology in 24 countries
  • More than 17 000 km of pipelines were inspected
  • More than 2700 test pits revealed zones of anomalies
 
Earth
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
flag
Joint ventures established in Malaysia and China;
Partners
MTM technology in Russia has been tested, and comparative tests at the facilities of leading Russian operators
p4
p3
p6
p2
p5
p1
Газпром
Транснефть
Роснефть
Алроса Газ
Get advice!
Leave a request and get a full consultation from our specialists.

Our specialist

Igor Kolesnikov Igor Kolesnikov
Ruslan Yusipov Ruslan Yusipov
Sergey Khlopotov Sergey Khlopotov
Yevgeny Krasnov Yevgeny Krasnov
Denis Voeikov Denis Voeikov
Artem Arakelov Artem Arakelov
Mikhail Zubets Mikhail Zubets
Ilya Polyakov Ilya Polyakov
Natalia Ryzhova Natalia Ryzhova
Maria Kalyanova Maria Kalyanova
Stepan Veremeyev Stepan Veremeyev
 Victor Makhov  Victor Makhov
Linar Khusnutdinov Linar Khusnutdinov
Svetlana Kamaeva, Ph.D Svetlana Kamaeva, Ph.D
Valerian Goroshevskiy, Ph.D Valerian Goroshevskiy, Ph.D

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Igor Kolesnikov

Co-owner of a company

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Ruslan Yusipov

Lead engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Sergey Khlopotov

Chief designer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Yevgeny Krasnov

Lead engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Denis Voeikov

Engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Artem Arakelov

Engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Mikhail Zubets

Engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Ilya Polyakov

Financial director

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Natalia Ryzhova

Director of quality

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Maria Kalyanova

Marketing director

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Stepan Veremeyev

Lead engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Victor Makhov

Chief Engineer

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Linar Khusnutdinov

Head of reliability laboratory of underwater pipelines

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Svetlana Kamaeva, Ph.D

General Director

The total length of the pipeline networks in Russia is more than 1 million. cm, about 80% are not subject to in-line diagnosis.

Valerian Goroshevskiy, Ph.D

Technical Director

What’s Next? debuts at Singapore Airshow 2018

04.02.2018

What’s Next? debuts at Singapore Airshow 2018

Transkor  took part in the Singapore Airshow  exhibition from 6th to 9th in February 2018.

Conferences and Exhibitions 2018

25.05.2018

Conferences and Exhibitions 2018

Transkor took part at the European event for the Corrosion Prevention of Oil and Gas Industry.

Publications

Whole article

A ‘non-invasive’ stress test

Piping Up For Technology Series (Part 1)